By: avtar
I booked house three years back and got possession only six month back. And after moving in relaized half of the things are not complete: Some are:
1) Telefone line is not connected. Bedroom and other rooms have fake point.
2) One of the toilet exit was not connected and we found only after two month when we used. To fix this they took another two months.
3) Hot water line was not connected, although I had paid extra for kitchen.
4) Paint color was wrong in one room.
5) Some of the eletrical point did not have any switch and some of the switch did not have anything to switch on/off.
Most of these things cant be fixed now, as finishing is done and Daadys are refusing to do this now.
1) Telefone line is not connected. Bedroom and other rooms have fake point.
2) One of the toilet exit was not connected and we found only after two month when we used. To fix this they took another two months.
3) Hot water line was not connected, although I had paid extra for kitchen.
4) Paint color was wrong in one room.
5) Some of the eletrical point did not have any switch and some of the switch did not have anything to switch on/off.
Most of these things cant be fixed now, as finishing is done and Daadys are refusing to do this now.